G&D SMART / Professional outdoor lighting
Permanent Outdoor Lighting Kits for Professional Installers
PERMANENT OUTDOOR LIGHTING KITS FOR INSTALLERS
Professional Installer Kits for 100ft, 200ft, 300ft and 400ft Projects
Use the kit pages as a project-planning starting point, not as a promise that the full labeled length is one continuous electrical run. Select voltage, fixture family and spacing, then confirm tracks, branches, GC08 capacity, cables, signal support and service parts from the actual property layout.
For most new professional programs, evaluate the 24V platform first. Use other voltages when the approved project architecture requires them.
Compare six permanent roofline lighting configurations for professional installers in the United States and Canada. Choose voltage and illuminated length, then request a component list for your property layout.
Compare all six Installer Kits
| Kit | Fixture options | Target illuminated length | Configuration |
|---|---|---|---|
| 12V 100ft | C5204A | 100ft | Drawing-based BOM review |
| 12V 200ft | C5204A | 200ft | Drawing-based BOM review |
| 24V 100ft | C5204B / C5205 / P23A | 100ft | Drawing-based BOM review |
| 24V 200ft | C5204B / C5205 / P23A | 200ft | Drawing-based BOM review |
| 24V 300ft | C5204B / C5205 / P23A | 300ft | Drawing-based BOM review |
| 24V 400ft | C5204B / C5205 / P23A | 400ft | Drawing-based BOM review |
How to choose
- Choose the voltage that matches your approved fixture and power architecture.
- Add up illuminated roofline segments; list extension gaps separately.
- Choose fixture spacing and model-matched mounting profile.
- Send the layout for GC08 load, branches, cables and signal-support review.
Included in the configuration review
Roofline fixtures, matched profiles, GC08 power/control, SH-M12A cables and branches, SFQ0401 where required, and the selected controller/firmware/App route. Exact quantities, box capacity, packaging and project drawings are confirmed in the approved quotation.
A kit length is the target total illuminated roofline, not an approved single-run distance. Review branch limits, wire gauge, voltage drop and power injection for each installation.
Professional Installer Program · OEM/ODM and private-label programs · Request a kit recommendation
Before Choosing a Kit Length
Use spacing to estimate fixture quantity, then use the cost and pricing guides to translate the BOM into a realistic installer project model.
Plan your next step with G&D SMART.
Share your application, target market and system requirements.