Skip to content
Permanent outdoor lighting systems • Hardware, control boxes & OEM/ODM

Professional installers

Make the installation repeatable before you scale the jobs.

For permanent-lighting installation companies that need a dependable system they can quote, install, service and reorder with less configuration ambiguity.

System BOMSample KitInstallation ResourcesReplacement Support

What installers need from a system supplier

01

A repeatable BOM

Define the light, track, control box, cable, connectors and signal accessories before the crew arrives on site.

02

Installation efficiency

Match fixture format, spacing, track and connection method to reduce avoidable field decisions.

03

Project support

Use sample configurations, wiring guidance and technical review to validate a representative project before repeating the setup.

04

Replacement support

Keep model, wiring and component references clear so future service starts from the approved configuration.

Installer support path

  1. Review a representative roofline layout and branch plan.
  2. Choose the voltage architecture and roofline fixture family.
  3. Match GC08 capacity, track, cables, connectors and signal accessories.
  4. Confirm the control route and installer-facing App requirements.
  5. Validate a sample kit before repeat project purchasing.

Tell us which business path you are building.

Share your customer type, target market, project or product stage, expected volume and the system capability you need. We can structure the next evaluation step around that information.

Discuss your project

Specify a repeatable roofline installation

Start with a drawing that records illuminated length, extension gaps, branch routes and the control-box location. Select the fixture, track and wiring set as one reviewed configuration.

Before ordering a kit

  • Confirm the fixture voltage and spacing.
  • Check track fit and access for replacement.
  • Review branch load, conductor size and signal route.
  • Confirm the selected firmware, App and scheduling behavior.
  • Keep the model instructions and certification scope with the project.

Open the system planning guide · Review your layout