G&D SMART / Professional outdoor lighting
Wet and Damp Location Evidence
Check the exact marked product, certificate scope and installation conditions. Roofline placement and IP ratings do not establish location suitability by themselves.
How do I verify installation environment and certification scope?
Short answer: assess the actual environment, then check certification records, markings and installation instructions for the exact model. IP67, low voltage or installation beneath a soffit does not establish suitability by itself.
| Item | Evidence to check |
|---|---|
| Installation environment | Direct rain, wind-driven rain, condensation and other moisture exposure |
| Fixture | Exact model, revision, voltage, location marking and instructions |
| Control box and supply | Input/output range, per-output limits, protection and certification scope |
| Cable and connectors | Model, gauge, electrical ratings, environmental suitability and connection method |
| Complete system | Whether documents cover the actual combination and installation conditions |
Example: 24V fixtures + GC08 + extensions + track
- Determine rain and wind-driven-rain exposure at the actual soffit.
- Match fixture model, voltage and revision to the certification scope.
- Check the control box, cable, connectors and extensions individually.
- Confirm prescribed installation methods and supply limits.
- Retain the wiring drawing, instructions and original certification documents.
UL Product iQ supports certification-record checks; certification of a component does not automatically establish certification of the complete installation.
The certification resource page identifies SHLED file E549391. Retain the original certificate holder and model scope; do not extend this file to GC08, C5206 or every complete system. For 36V and 48V projects, do not claim Wet suitability without exact supporting documentation, and do not automatically classify soffit installations as Damp.
Specifications and evidence
Original files and model scope · UL Product iQ · UL 2108 standard reference
Keep the installation evidence together
Retain the product label, certificate, model scope, hardware revision, mounting orientation, sealing and cable-entry instructions, temperature limits and approved system drawing. IP ingress protection and North American location certification describe different requirements.
Required run-length test record
Record the exact model and hardware revision, supply voltage, fixture count, fixture spacing in inch, wire gauge (AWG) and conductor material, extension length in ft, connector models and quantities, load mode and brightness setting, ambient temperature, measured branch current, and voltage at the first and last fixtures. Test the intended maximum-load channel combination after thermal stabilization and record light/color consistency and connector temperature. Preserve the wiring drawing and report revision. Calculation examples are planning aids and do not establish a validated maximum run length.
Plan your project
Discuss your fixture, wiring and control requirements · Technical Center
Plan your next step with G&D SMART.
Share your application, target market and system requirements.