Skip to content
Permanent outdoor lighting systems • Hardware, control boxes & OEM/ODM
Discuss Your Project
Menu

G&D SMART / Professional outdoor lighting

Wet and Damp Location Evidence

Check the exact marked product, certificate scope and installation conditions. Roofline placement and IP ratings do not establish location suitability by themselves.

How do I verify installation environment and certification scope?

Short answer: assess the actual environment, then check certification records, markings and installation instructions for the exact model. IP67, low voltage or installation beneath a soffit does not establish suitability by itself.

Item Evidence to check
Installation environment Direct rain, wind-driven rain, condensation and other moisture exposure
Fixture Exact model, revision, voltage, location marking and instructions
Control box and supply Input/output range, per-output limits, protection and certification scope
Cable and connectors Model, gauge, electrical ratings, environmental suitability and connection method
Complete system Whether documents cover the actual combination and installation conditions

Example: 24V fixtures + GC08 + extensions + track

  1. Determine rain and wind-driven-rain exposure at the actual soffit.
  2. Match fixture model, voltage and revision to the certification scope.
  3. Check the control box, cable, connectors and extensions individually.
  4. Confirm prescribed installation methods and supply limits.
  5. Retain the wiring drawing, instructions and original certification documents.

UL Product iQ supports certification-record checks; certification of a component does not automatically establish certification of the complete installation.

The certification resource page identifies SHLED file E549391. Retain the original certificate holder and model scope; do not extend this file to GC08, C5206 or every complete system. For 36V and 48V projects, do not claim Wet suitability without exact supporting documentation, and do not automatically classify soffit installations as Damp.

Specifications and evidence

Original files and model scope · UL Product iQ · UL 2108 standard reference

Keep the installation evidence together

Retain the product label, certificate, model scope, hardware revision, mounting orientation, sealing and cable-entry instructions, temperature limits and approved system drawing. IP ingress protection and North American location certification describe different requirements.

Required run-length test record

Record the exact model and hardware revision, supply voltage, fixture count, fixture spacing in inch, wire gauge (AWG) and conductor material, extension length in ft, connector models and quantities, load mode and brightness setting, ambient temperature, measured branch current, and voltage at the first and last fixtures. Test the intended maximum-load channel combination after thermal stabilization and record light/color consistency and connector temperature. Preserve the wiring drawing and report revision. Calculation examples are planning aids and do not establish a validated maximum run length.

Plan your project

Discuss your fixture, wiring and control requirements · Technical Center

Plan your next step with G&D SMART.

Share your application, target market and system requirements.

WhatsApp · Talk to G&D SMART

Choose the right person for a quick conversation. WhatsApp opens with a ready-to-send message referencing this page.

WhatsApp opens your chat; please press Send to deliver the message.

Or send an email inquiry

Privacy policy · Project inquiry

Quick Inquiry

Tell us what you need. Our team will get back to you.

Detailed project inquiry