G&D SMART Sequence and Direction Settings: An Installer Guide
November 10, 2026
Sequence and direction settings help align a lighting effect with the physical roofline layout. They do not reverse an incorrectly connected data input or remove the need for correct SPI wiring. First establish a working, approved electrical connection; then use the G&D SMART App to configure the supported visual order and direction.
Diagnose the problem before changing settings
A run that lights correctly but animates in the unwanted direction is different from a run that is dark, flickers or receives no data. The first may be a sequence-configuration issue. The others require inspection of power, connections, signal path and the approved installation. Do not use a software direction control as a workaround for a physical input/output or pin-assignment mistake.
Start with a count and position check
Confirm the configured point count and identify where the first and last controlled lights are physically located. In a two-sided roofline, the controller may sit near the center while the desired animation should travel across the whole frontage. Record which output reaches each side and where its physical endpoint lies. This gives meaning to the sequence options rather than relying on repeated guessing.
Understand continuous and mirror behavior
A continuous presentation can be useful when a pattern should appear to travel across connected sections in a chosen order. Mirror behavior can suit a symmetrical facade. The supplied App guide illustrates four non-mirror order choices and two mirror directions for its dual-output example. Those screenshots explain the workflow; they do not establish the port pairing or available combinations on every GC08 four-port firmware revision.
Use a simple test pattern
During commissioning, select an easily recognized moving effect rather than a complex multicolor show. Observe where it starts, the direction it travels and whether the transition between sections matches the intended presentation. Change one setting at a time and record the result. Once the sequence is correct, test the customer's preferred scene. This separates layout configuration from aesthetic choices and makes troubleshooting more systematic.
Coordinate sequence with zones
Zones represent the areas the user wants to control. The supplied guide allows a zone to include several defined segments and includes reverse-direction and mirror controls. A zone's visual arrangement should be checked against the actual installation. Do not assume that creating a software zone adds an electrical output, increases power capacity or makes an unsupported physical branch independent.
Preserve the commissioned configuration
For the GC08 four-port standard program, include the approved port map, configured counts, sequence choice and relevant App/firmware versions in the handover record. G&D SMART's advantage is a configuration workflow that installers can demonstrate and repeat. Its value is not a claim that software can correct any wiring layout. Correct connections and clear software mapping work together to reduce avoidable rework.

Practical review checklist
- Verify electrical wiring and data input before changing visual settings.
- Confirm point counts and identify each installed segment.
- Test continuous and mirror behavior with an observable pattern.
- Record the selected sequence, direction and firmware version.
Frequently asked questions
Can Reverse Direction fix a light string connected to the wrong data end?
No. Physical data direction and pin assignments must be correct before visual sequence controls are used.
Can the dual-output example be applied to every four-port box?
Only after confirming the actual GC08 signal mapping and supported firmware behavior.
Explore G&D SMART App workflows
Related technical resources
Sources and scope
- G&D SMART App operating workflows. Interface examples are not wiring diagrams; use the matched controller and firmware.
- GC08 control-box platform
- G&D SMART App overview